| Sample ID | QA-CAL-2026-Q2 |
| Title | SMU calibration & laboratory compliance logbook (ISO/IEC 17025) |
| Status | Completed |
| Operator | Quality officer: H. Arslan |
| Laboratory / Facility | MikroFab Metrology / Quality Unit |
| Tags | quality, calibration, ISO 17025, traceability, GLP |
| Notes | 2026 Q2 periodic SMU verification + compliance records. |
| Instrument Name | Source-measure unit (SMU) |
| Model | Keithley 2636B |
| Serial No | 4102217 |
| Location | Measurement room 1 |
| Calibration Date | 2027-06-25 |
| Settings | Reference: Fluke 8588A (traceable, certificate #FL-2026-0412). |
| Reservation / User | Metrology — closed |
| Organization | Number | Title | Clause | Status |
| ISO/IEC | 17025:2017 | Competence of testing and calibration laboratories | 6.4, 7.2 | Compliant |
| JCGM | 100:2008 (GUM) | Guide to the expression of uncertainty in measurement | — | Applied |
| ASTM | E2655 | Uncertainty reporting guide | — | Reference |
| Test | Method / Standard | Expected | Result | Pass |
| Voltage source accuracy (10 V) | ISO 17025 / GUM | ±0.02% + 2.4 mV | +1.1 mV | ✓ |
| Current measurement accuracy (1 mA) | Fluke 8588A comparison | ±0.05% + 100 nA | +220 nA | ✓ |
| Low-current leakage (1 nA range) | short-circuit reading | ≤50 fA | 32 fA | ✓ |
| Warm-up drift (1 h) | 10 V constant, logged | ≤5 ppm | 3 ppm | ✓ |
| Chemical / Agent | High-voltage SMU (±200 V) |
| GHS Class / H-Statements | — |
| Hazard | Electric shock; exposed tip at the probe station |
| PPE (Personal Protective) | Insulated gloves not required (<±42 V operation); lockout-tagout at ≥±42 V |
| Exposure Limit | — |
| First Aid | Shock: cut power, 112, CPR-trained personnel. |
| Risk Level | Medium |
| Version | SOP-CAL-03 Rev 2 |
| Scope | 12-month periodic verification of all SMU/DMM units |
| Materials / Reagents | Traceable reference (Fluke 8588A), temperature/humidity logging |
| Procedure (step by step) | 1) 1 h warm-up. 2) 5-point voltage + 5-point current. 3) Deviation and uncertainty calculation (GUM). 4) Issue certificate. 5) Update label. |
| Hazards | Lockout-tagout during high-voltage steps |
| References | ISO 17025:2017 §7.2; GUM |
| Performed by | H. Arslan (quality officer) |
| Reviewed by | Dr. E. Yılmaz |
| Approved by | Prof. A. Kara (lab manager) |
| Date | 2026-06-26 |
| Role / Title | Quality / Metrology |
| Statement | Instrument passed all verification tests; certificate #CAL-2026-0188 issued, next verification 2027-06-25. |